The complete new build of a new hall to the rear of the existing Baptist church.
The only access to the site was via a 2 metre wide gap to the side of the existing building which had an effect on the types of materials chosen. The main frame is timber gluelam beams and trusses with brick and timber infills to the walls with a slate roof.
We carried out all the elements of the construction and fit out including the design and installation of the electrical and mechanical.
|